Caspian 2 Industrial Town, Abyek, Qazvin
info@etmirco.com
028-32884140

Due to the entry of black powder into the turbines and in order to solve the problems of the fuel nozzles, after troubleshooting the filtration system of this power plant was redesigned. For particles above 2 microns up to 98%, the design, construction and installation of equipment were carried out.




If you have any questions simply use the following contact details.